Constructing a large-scale manufacturing facility for the renewable energy sector, anchored by a 17,000 Sq. M. Production Shed.
The project includes significant civil works: 2,500 Sq. M. of internal RCC roads with a covered drainage system and a 900-meter-long decorative compound wall and gate.