A large-scale Testing Unit at Por (Vadodara) anchored by a 1,00,000 Sq. Ft. Industrial Shed for manufacturing operations.
The project includes comprehensive site infrastructure: a 350-meter RCC road with drainage, an 80 KL Sewage Treatment Plant, and a dedicated 250 KL Fire Water Storage Tank.