SVIT
( Sardar Vallabhbhai Patel Institute of Technology )
Gujarat
Project Summary
Rudrani Infrastructure & Developers played a major role in constructing various buildings and facilities at SVIT. Here’s a breakdown of their contributions:
- Academic Block: Constructed a G+3 RCC building with a total area of 50,000 sqft, including digital classrooms.
- Engineering Workshop: Built a single-roof RCC workshop spanning 9,000 sqft.
- Administrative Complex: Constructed a 13,500 sqft RCC building encompassing staff rooms, canteen, and pantry.
- Computer Lab & Exhibition Hall: Developed a 13,500 sqft RCC building housing an advanced computer lab and a model exhibition center.
- Grand Entrance: Constructed an elegant 25ft high RCC main entrance gate with a green podium area, covering 9,000 sqft.
- Water Management System: Built a 600,000-liter RCC water tank with a pump room for both domestic use and fire safety.
- Sewage Treatment Plant: Constructed a 300,000-liter RCC tank for a sewage treatment plant (STP) including a sock pit.
- Infrastructure & Landscaping: Developed a 60,000 sqft area with pavers, decorative landscaping, and internal roads, creating a green and well-connected space.
PROJECT DURATION
Sep 2019 March 2022
LOCATION
Gujarat
TYPE
Institutional
STATUS
Completed
INDUSTRY
Education